I have received the following form a WC highway engineer.
"Thanks for your email.
I will prepare the necessary documentation to formally advertise the proposed closure through the TRO process.
However, with current workload and lead-in times for TRO adverts, it’s likely the formal consultation will be in the early Autumn."